A battery can help relieve pressure on an overloaded electricity grid. But place that same battery at the wrong point in the grid, and it can actually worsen congestion. It shows why solving grid congestion requires more than simply adding new technology. You need the right data and a clear understanding of how energy flows through the local grid. In the Netherlands, where limited grid capacity is already affecting companies’ plans to grow and electrify, these insights are becoming increasingly important. How can we use the capacity that is already available more intelligently?
The energy transition is rapidly changing how electricity is produced and consumed. We are electrifying transport, heating and industry, while at the same time connecting more solar and wind generation. In the Netherlands, these developments are happening faster than the electricity grid can be expanded.
Large companies are already facing long waiting times for new or larger grid connections. For companies, limited grid capacity can directly interfere with plans to grow and become more sustainable. And the consequences extend beyond industry. An impact analysis by the municipality of Utrecht estimates that thousands of planned new homes in the Dutch province Utrecht could face delays in being connected to the electricity grid due to capacity constraints.
Building more grid infrastructure remains essential but requires time and workforce. In the meantime, flexibility, storage and smarter coordination of energy demand and generation can help make better use of the existing grid.
Green Energy Management for Business Parks
This is one of the challenges addressed by GEMS – Green Energy Management Systems, an Interreg North-West Europe project with 14 partners and six pilots across five countries. GEMS explores how Energy Management Systems (EMS) can help business parks coordinate energy generation, consumption, storage and flexibility. The project is also developing a digital tool to help other business parks and companies explore how EMS strategies could work in their own situation.
One of the experts working on this is Dr. Nataly Bañol Arias, Assistant Professor at the University of Twente. Her research focuses on modelling and optimising modern distribution grids and microgrids. Within GEMS, she develops generic energy-system models and EMS-based optimisation strategies that can potentially be applied in other regions as well.
A battery can help, but where you place it matters
Research around the ‘Bedrijvenpark Twentekanaal (BIT)’ area shows why smart energy management involves more than simply installing new technology. Thomas de Rooij, a Master Student from The University of Twente, analysed the local grid topology together with energy consumption profiles to identify potential congestion points and test how a battery provided by the municipality could help. The research was conducted under the supervision of Dr. Nataly Bañol Arias from the University of Twente and Erwin Scheggetman from Powerspex.
The outcome showed that the location of the battery within the grid made a crucial difference. “At the right location, it could help relieve congestion. At another location, for example further upstream in the grid, the same battery could actually worsen the situation, introducing stronger local transformer loading and voltage fluctuations”, dr. Bañol Arias points out.
For companies and business park managers, this is an important lesson. The question is not simply whether to invest in battery storage, but how storage interacts with local generation, consumption and the electricity network. An EMS can bring these elements together and help determine when and where flexibility creates value.
Better decisions require better data
That analysis also exposes one of the main challenges GEMS encounters: access to data. “To make the right decisions we require insight into energy consumption and existing energy assets, but also into cables, transformers, topology, and other parts of the local grid”, dr. Bañol Arias explains. “At the same time, companies are understandably reluctant to share individual energy consumption patterns or information that could expose their activities”.
“When detailed information is unavailable, estimates and aggregated data can be used, but this limits how accurately congestion and potential solutions can be assessed”, dr. Bañol Arias continues. EMS implementation is therefore not only a technical challenge. It also requires cooperation and trust between companies, business park managers, DSOs and other stakeholders about what data is needed and how it can be shared.
Turning local experience into solutions for Europe
“Grid congestion is currently particularly visible in the Netherlands, but the underlying developments are happening across Europe. Electricity demand is increasing through industrial electrification, AI applications, data centres and other developments, while more renewable energy is being integrated into local grids”, dr. Bañol Arias emphasizes.
That is why GEMS brings together pilots in the Netherlands, Belgium, Germany, France and Ireland. Rather than developing one solution for one business park, partners use these different environments to learn which approaches can be adapted and applied elsewhere. “It is a collective effort towards decarbonization and grid congestion.”
By translating lessons from all six pilots into generic models, practical guidelines and a digital tool, GEMS aims to help business parks across Europe explore their options and make smarter use of available electricity grid infrastructure – supporting both the energy transition and future economic development.
Are you also interested in EMS solutions for your company or business park? Get in touch with the GEMS project to explore the possibilities.